![]() ![]() Additionally, WJE participated in periodic site visits with the local fire department. Per our guest safety and sanitation policies we are not allowing minors or pets (other than service animals) at any of our locations. The project includes a 23-story hotel tower with 317 guestrooms, executive offices space, gaming floor expansion, a high-end spa, ballroom, 10 meeting rooms, and rooftop swimming pool. FWCCustomerService, Customer Service Team at Four Winds Casino South Bend, responded to this review Responded SeptemHello, Thank you for taking the time to write a review. WJE also worked closely with the Pokagon Band of Potawatomi Indians’ local government team-including a health inspector-and the Four Winds Casino management and construction teams during the course of the project. Gephart provided design-assist electrical and low voltage services for a large expansion to the existing casino (which we completed in 2018). WJE reviewed test reports performed by the materials testing company for concrete, steel, soil, and spray-applied fireproofing. WJE was also engaged as a full-time, on-site presence during construction to review construction work and attend project meetings with a goal of identifying code-related issues as soon as possible in an effort to avoid major issues at the end of the project that could delay the opening date. The project responsibilities included peer review of design drawings at major milestones during the design process to provide code-related comments. In addition to fire protection, the scope of services provided by WJE included disciplines of building, structural, mechanical, electrical, plumbing, elevators, and civil. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |